Guidance Systems


Level: T3
Need structure: Advanced Industry Facility
Volume: 6
Cycle: 3 pcs 60 m
Price (Jita):

Tree resourse and planets

    Hour Day Week
Output 3 18 m3 72 432 m3 504 3024 m3
Resourses:
 -  [T2] Water-Cooled CPU 10 pcs 2 x Advanced Industry Facility | 5 pcs / 60 m | 7.5 m3 10 15 m3 240 360 m3 1680 2520 m3
 -  -  [T1] Reactive Metals 40 pcs 2 x Basic Industry Facility | 20 pcs / 30 m | 7.6 m3 80 30.4 m3 1920 729.6 m3 13440 5107.2 m3
 -  -  -  [T0] Base Metals 3000 pcs Extractor on Lava, Plasma, Barren, Storm, Gas 12000 120 m3 288000 2880 m3 2016000 20160 m3
 -  -  [T1] Water 40 pcs 2 x Basic Industry Facility | 20 pcs / 30 m | 7.6 m3 80 30.4 m3 1920 729.6 m3 13440 5107.2 m3
 -  -  -  [T0] Aqueous Liquids 3000 pcs Extractor on Barren, Temperate, Storm, Oceanic, Ice, Gas 12000 120 m3 288000 2880 m3 2016000 20160 m3
 -  [T2] Transmitter 10 pcs 2 x Advanced Industry Facility | 5 pcs / 60 m | 7.5 m3 10 15 m3 240 360 m3 1680 2520 m3
 -  -  [T1] Plasmoids 40 pcs 2 x Basic Industry Facility | 20 pcs / 30 m | 7.6 m3 80 30.4 m3 1920 729.6 m3 13440 5107.2 m3
 -  -  -  [T0] Suspended Plasma 3000 pcs Extractor on Lava, Plasma, Storm 12000 120 m3 288000 2880 m3 2016000 20160 m3
 -  -  [T1] Chiral Structures 40 pcs 2 x Basic Industry Facility | 20 pcs / 30 m | 7.6 m3 80 30.4 m3 1920 729.6 m3 13440 5107.2 m3
 -  -  -  [T0] Non-CS Crystals 3000 pcs Extractor on Lava, Plasma 12000 120 m3 288000 2880 m3 2016000 20160 m3

Components by sructures

Output 3 72 504
Resourses: Count Hour Day Week
Extractor
[T0] Base Metals (Lava, Plasma, Barren, Storm, Gas) 12000 120 m3 288000 2880 m3 2016000 20160 m3
[T0] Aqueous Liquids (Barren, Temperate, Storm, Oceanic, Ice, Gas) 12000 120 m3 288000 2880 m3 2016000 20160 m3
[T0] Suspended Plasma (Lava, Plasma, Storm) 12000 120 m3 288000 2880 m3 2016000 20160 m3
[T0] Non-CS Crystals (Lava, Plasma) 12000 120 m3 288000 2880 m3 2016000 20160 m3
Basic Industry Facility 8
[T1] Reactive Metals 2 80 30.4 m3 1920 729.6 m3 13440 5107.2 m3
[T1] Water 2 80 30.4 m3 1920 729.6 m3 13440 5107.2 m3
[T1] Plasmoids 2 80 30.4 m3 1920 729.6 m3 13440 5107.2 m3
[T1] Chiral Structures 2 80 30.4 m3 1920 729.6 m3 13440 5107.2 m3
Advanced Industry Facility 5
[T3] Guidance Systems 1 3 18 m3 72 432 m3 504 3024 m3
[T2] Water-Cooled CPU 2 10 15 m3 240 360 m3 1680 2520 m3
[T2] Transmitter 2 10 15 m3 240 360 m3 1680 2520 m3

Return to list


			
server status